Stage 2: fitting units after renovation
Pipework is in: we hang the indoor and outdoor unit, connect, vacuum, start up and brief you. Usually 2–3 hours, no dust.
How stage 2 goes
- Leak check of the prepared pipework
- Indoor unit and outdoor unit on brackets
- Connection, 15–20 minutes of vacuuming
- Start-up, checks, briefing, contract and warranty
If someone else laid the pipework, we check it free at the survey: diameters, drain slope, cable gauge.
Stage 2 price
- 20–35 м²1 500 lei
- 40–55 м²1 800 lei
- 60–80 м²2 000 lei
- 80–100 м²2 500 lei
Materials and work that depend on your home. The installer prices them at the free survey, before work starts. No extra charges after installation.
Prices by room-size class
| Room size | Full | Stage 1 | Stage 2 |
|---|---|---|---|
| 20–35 м² | 1 800 lei | 1 300 lei | 1 500 lei |
| 40–55 м² | 2 200 lei | 1 600 lei | 1 800 lei |
| 60–80 м² | 2 400 lei | 2 000 lei | 2 000 lei |
| 80–100 м² | 2 800 lei | 2 200 lei | 2 500 lei |
More about installation: Air conditioner installation prices in Chișinău · Stage 1: pipework during renovation · Extra work and materials
Not sure which installation you need?
Leave your number: we call back within 15 minutes and, if needed, visit for a free survey in Chișinău.